Tariff Management › New Submission
New Tariff Submission
Complete all 8 steps to submit your tariff proposal for regulatory review
✓
Tariff Type
2
Basic Info
3
Cost Structure
4
Technical Params
5
Revenue Projections
6
Documents
7
Review Summary
8
Submit
Step 1 — Select Tariff Type
⚡
Generator Tariff
Electricity generation cost recovery tariff
🛣
Transmission Tariff
High-voltage transmission network charges
🔋
Distribution Tariff
Low-voltage distribution network charges
💡
Feed-in Tariff
Renewable energy guaranteed purchase rate
💥
Gas Distribution
Natural gas city gate to end-user pricing
🚩
Gas Transmission
Natural gas pipeline transportation fees
⛽
Retail Fuel Tariff
Petroleum product end-consumer pricing
⛈
Steam Tariff
Geothermal steam supply pricing
Step 2 — Basic Information
Step 3 — Cost Structure
Enter cost components used to calculate the proposed tariff rate. All figures in IDR millions per year unless specified.
| Cost Component | Current (IDR M) | Proposed (IDR M) | Change (%) |
|---|---|---|---|
| A. Operating Costs | |||
| Fuel & Energy Purchase | +12.5% | ||
| Operations & Maintenance | +8.1% | ||
| Employee Costs | +7.7% | ||
| Administrative Expenses | +5.6% | ||
| Total Operating Costs | 58,190 | 64,730 | +11.2% |
| B. Capital Costs | |||
| Depreciation | +10.4% | ||
| Return on Invested Capital | +6.3% | ||
| Debt Service | 0.0% | ||
| Total Capital Costs | 26,300 | 28,200 | +7.2% |
| C. Other Allowances | |||
| Regulatory Fees | +7.1% | ||
| Contingency Allowance (2%) | +10.0% | ||
| Total Revenue Requirement | 86,608 | 95,248 | +9.98% |
| Implied Tariff Rate | BDT 1,285/kWh | BDT 1,420/kWh | +10.5% |
Step 4 — Technical Parameters
Step 5 — Revenue Projections
| Year | Energy Sales (GWh) | Revenue (IDR B) | Costs (IDR B) | Net Income (IDR B) | ROE (%) |
|---|---|---|---|---|---|
| 2026 (Proposed) | 9,048 | ||||
| 2027 | 10,120 | ||||
| 2028 | 11,100 |
Step 6 — Supporting Documents
Upload all required documents. Accepted formats: PDF, XLSX, DOCX. Max 20 MB each.
📄
Cost of Service Study
Required — Full actuarial cost study report
📄
Audited Financial Statements (3 years)
Required — Last 3 fiscal years, auditor-certified
📄
Consumer Impact Analysis
Required — Affordability and household impact study
📄
Capital Expenditure Plan
Required — 5-year CAPEX schedule
📄
Technical Feasibility Report
Optional — Supporting technical documentation
📄
Board Resolution
Required — Authorizing the tariff application
Step 7 — Review Summary
Company
BPDB
Sector
Electricity
Tariff Type
Generator Tariff
Effective Date
01 July 2026
Current Tariff
BDT 1,285 / kWh
Proposed Tariff
BDT 1,420 / kWh +10.5%
Revenue Requirement
IDR 95,248 M
Tariff Period
2 Years (2026–2028)
DOCUMENT CHECKLIST
✓ Cost of Service Study — Uploaded
✓ Audited Financial Statements — Uploaded
✗ Consumer Impact Analysis — Missing (Required)
✗ Capital Expenditure Plan — Missing (Required)
✓ Board Resolution — Uploaded
⚠ 2 required documents are missing. You may save as draft and return to upload them, or proceed to submit and upload within 5 working days.
✅
Submission Confirmed
Your tariff proposal has been submitted successfully.
TRF-2026-049
Submission received on 22 April 2026 at 14:32 WIB
Assigned to Screening Queue — expected review within 10 working days
Assigned to Screening Queue — expected review within 10 working days